Blog – Western Australia Contractors & Tradespeople Association for Disability Retrofits http://www.abwa.asn.au Mon, 08 Apr 2019 00:24:46 +0000 en-US hourly 1 https://wordpress.org/?v=5.0.8 Pouring Concrete Like a True Pro http://www.abwa.asn.au/pouring-concrete-like-true-pro/ Sat, 10 May 2014 23:17:45 +0000 http://www.abwa.asn.au/?p=840 Underneath is a step by step guide on the best way to pour concrete.

Measure #1: Make a strategy

Like every significant job that is DIY, you must plan for your concrete as it is incredibly hard to correct in the event that you make a blunder, placing job. You should assess the space you want to concrete over. In addition, you have to take into account other variables like foot traffic, and disposition, weather, amongst others.

Measure #2: Prepared the materials

In the event you are coping with a tiny region, you can simply buy pre-mixed concrete. For bigger regions, it'd be more cost effective should you get the materials independently and then combine others yourself. While there are various kinds of pre-mixed concrete, look for the ones which are suited to residential jobs. As part of your materials checklist, do not forget to include the following:

  • Timber boards
  • Cord and wooden pegs
  • Fibreboard strips
  • Contractor's square
  • Spirit level
  • Scoop and spade
  • Polythene sheeting
  • Measure

#3: Prepare the foundation

Dig to the depth you want to fill with concrete, when you are done. Keep in mind that the foundation needs to be larger by 75mm to 150mm in relation to the finished slab.

Step #4: Set up the formwor

Put the lumber boards against the wooden pegs and align them correctly using the cords. Make use of the spirit level to see whether the very top of the formwork is with the concrete. Ultimately, nail the boards to the wooden pegs so the concrete would not ooze out and ensure there are not any spaces in between them.

Measure #5: Combine the concrete

It will be wise to employ a power mixer, in the event you are working on a big region. For smaller jobs, you can combine your concrete. Only see that you won't mix concrete on soil; use a wooden plank instead.

To the plank using a spade, measure the proper quantity of every substance, stack a bucket with it, and combine the stuff until the colour is uniform. Dig a hole in the middle out, add some water, then turn the mixture over several times until everything is damp, and push in the concrete mixture into the small moat.

Step #6: Pour and level the concret

Pour into the formwork and distribute the mixture equally using your spade. In the event you are placing concrete over a place broader or longer than 4 metres, part the formwork into several sections using fibreboard strips to stop the concrete from cracking. Ensure all places in the formwork are correctly filled with no spaces in between.

Eliminate as essential.

Measure #7: enable the concrete to place

Cover with all the polythene sheeting. Wait for a complete day before removing the formwork.

The post Pouring Concrete Like a True Pro appeared first on Western Australia Contractors & Tradespeople Association for Disability Retrofits.

]]>
Underneath is a step by step guide on the best way to pour concrete.

Measure #1: Make a strategy

Like every significant job that is DIY, you must plan for your concrete as it is incredibly hard to correct in the event that you make a blunder, placing job. You should assess the space you want to concrete over. In addition, you have to take into account other variables like foot traffic, and disposition, weather, amongst others.

Measure #2: Prepared the materials

In the event you are coping with a tiny region, you can simply buy pre-mixed concrete. For bigger regions, it’d be more cost effective should you get the materials independently and then combine others yourself. While there are various kinds of pre-mixed concrete, look for the ones which are suited to residential jobs. As part of your materials checklist, do not forget to include the following:

  • Timber boards
  • Cord and wooden pegs
  • Fibreboard strips
  • Contractor’s square
  • Spirit level
  • Scoop and spade
  • Polythene sheeting
  • Measure

#3: Prepare the foundation

Dig to the depth you want to fill with concrete, when you are done. Keep in mind that the foundation needs to be larger by 75mm to 150mm in relation to the finished slab.

Step #4: Set up the formwor

Put the lumber boards against the wooden pegs and align them correctly using the cords. Make use of the spirit level to see whether the very top of the formwork is with the concrete. Ultimately, nail the boards to the wooden pegs so the concrete would not ooze out and ensure there are not any spaces in between them.

Measure #5: Combine the concrete

It will be wise to employ a power mixer, in the event you are working on a big region. For smaller jobs, you can combine your concrete. Only see that you won’t mix concrete on soil; use a wooden plank instead.

To the plank using a spade, measure the proper quantity of every substance, stack a bucket with it, and combine the stuff until the colour is uniform. Dig a hole in the middle out, add some water, then turn the mixture over several times until everything is damp, and push in the concrete mixture into the small moat.

Step #6: Pour and level the concret

Pour into the formwork and distribute the mixture equally using your spade. In the event you are placing concrete over a place broader or longer than 4 metres, part the formwork into several sections using fibreboard strips to stop the concrete from cracking. Ensure all places in the formwork are correctly filled with no spaces in between.

Eliminate as essential.

Measure #7: enable the concrete to place

Cover with all the polythene sheeting. Wait for a complete day before removing the formwork.

The post Pouring Concrete Like a True Pro appeared first on Western Australia Contractors & Tradespeople Association for Disability Retrofits.

]]>
Protecting Pensioners From Tradesmen http://www.abwa.asn.au/protecting-pensioners-tradesmen/ Mon, 20 Aug 2012 10:47:27 +0000 http://www.abwa.asn.au/?p=799 It’s the new service protecting seniors from being ripped off by dodgy tradies. The tradesmen are reliable, the work is honest and it’s dirt cheap. The Commonwealth Home and Community Care (HACC) Program provides funding for services which support frail older people and their carers, who live in the community and whose capacity for independent […]

The post Protecting Pensioners From Tradesmen appeared first on Western Australia Contractors & Tradespeople Association for Disability Retrofits.

]]>
It’s the new service protecting seniors from being ripped off by dodgy tradies. The tradesmen are reliable, the work is honest and it’s dirt cheap.

The Commonwealth Home and Community Care (HACC) Program provides funding for services which support frail older people and their carers, who live in the community and whose capacity for independent living are at risk of premature or inappropriate admission to long term residential care.

Older people are people aged 65 years and over and Aboriginal and Torres Strait Islander people aged 50 years and over.

For more information, phone the Aged Care Information Line on 1800 200 422.

Source : http://aca.ninemsn.com.au/article/8529215/protecting-pensioners

The post Protecting Pensioners From Tradesmen appeared first on Western Australia Contractors & Tradespeople Association for Disability Retrofits.

]]>
Balustrade and handrails for Disability access and mobility compliant http://www.abwa.asn.au/balustrade-and-handrails-for-disability/ Wed, 15 Sep 2010 13:13:31 +0000 http://elegantthemes.com/preview/DeepFocus/?p=205 A handicap access and freedom balustrade that is compliant facilitates circulation As part of the BCA codes, handicap accessibility and freedom balustrades that are compliant use handrails that are uninterrupted, making them suitable and simple for everyone to grab and move through spaces unimpeded. Freedom and handicap accessibility are critical to the legal and successful functioning […]

The post Balustrade and handrails for Disability access and mobility compliant appeared first on Western Australia Contractors & Tradespeople Association for Disability Retrofits.

]]>
A handicap access and freedom balustrade that is compliant facilitates circulation As part of the BCA codes, handicap accessibility and freedom balustrades that are compliant use handrails that are uninterrupted, making them suitable and simple for everyone to grab and move through spaces unimpeded. Freedom and handicap accessibility are critical to the legal and successful functioning of a space.

Conforming to these codes empowers greater access for the disabled and easier flow. Each of the balustrades holds and creates a feeling of movement.

The post Balustrade and handrails for Disability access and mobility compliant appeared first on Western Australia Contractors & Tradespeople Association for Disability Retrofits.

]]>